1·A new type of column_beam joint of concrete filled steel tubular (CFST) is presented.
提出一种全新的钢管混凝土柱-梁节点形式。
2·A steel tubular intersecting joint is one of the main joints in steel tube structures.
钢管相贯节点是钢管结构中最主要的节点形式之一。
3·The technology for construction of steel tubular pile caps is described in the this paper.
文章主要介绍钢管桩桩帽的施工工艺。
4·Bending of concrete filled steel tubular (CFST) dumbbell-shaped beams is studied experimentally.
进行了钢管混凝土哑铃型梁的试验与分析。
5·It makes an economic analysis of setting up suspending platform and full steel tubular scaffold.
对搭设悬索平台和搭设满堂脚手架进行经济分析。
6·In this experiment, castor oil was pyrolyzed in a stainless steel tubular reactor packed with catalyst.
本实验以蓖麻油为原料,位其在一装有催化剂的不锈钢反应器中进行裂解。
7·The results show that the frame of steel beam-concrete filled steel tubular has the good seismic behavior.
实验结果表明,钢梁-钢管混凝土框架结构具有良好的抗震性能。
8·Transmission steel tubular towers have been widely applied to superhigh voltage transmission lines in China.
钢管塔在我国特高压输电线路中得到广泛应用。
9·Analyzing and monitoring spatial stress of concrete-filled steel tubular tower in the whole construct course.
对钢管混凝土索塔空间应力进行了全过程分析和监测。
10·Steel ratio is one of the most important factors affecting the ductility of concrete-filled steel tubular frames.
含钢率是影响钢管混凝土框架结构延性的重要因素。